Re: Canada - Future Fighter Capability Project

Tue Feb 13, 2018 9:04 am

Ozair wrote:
Dutchy wrote:
So the big question is, which fighters will be in production then?

Well from the list of potential candidates approached by Canada,

F-35 – Confirmed and there will be ~1300 F-35s flying by 2025.
Rafale- Confirmed (The French recently announced plans for additional aircraft out to 2025).
Super Hornet – Unlikely. With only Kuwait to go for export and likely limited USN purchases going forward its days are numbered.
Eurofighter – Probably. It will at least be in production until 2022 when the Canadians plan to sign a contract so if selected it would be able to continue production and fulfil a Canadian order.
Gripen E – Unlikely candidate but will be in production in that timeframe.


Depends a lot of other countries' decision. Other than unpredictable ME countries purchasing unpredictable amount of unpredictable planes, in Europe at least Finland will buy a rather equal amount of rather similar planes probably just before Canada (Poland etc less likely and smaller amounts). Finnish conditions are rather similar to Canada (cold weather, road strips to be used as airfield) but military environment is very different. There is a small chance that Finland will make Eurofighter to survive until Canadian order and smaller chance for Super Hornet (if that is politically eligible for Canada anyway, but which is then).
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Tue Feb 13, 2018 2:00 pm

I think over the last 3 months the chances for the Rafale have not been reduced. The partnerships between US (Trump), France (Macron), Canada (Trudeau) and Germany (Merkel) changed of time. The US decided to focus on their own needs / interest and that's their good right.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Feb 13, 2018 8:28 pm

YIMBY wrote:
Depends a lot of other countries' decision. Other than unpredictable ME countries purchasing unpredictable amount of unpredictable planes, in Europe at least Finland will buy a rather equal amount of rather similar planes probably just before Canada (Poland etc less likely and smaller amounts). Finnish conditions are rather similar to Canada (cold weather, road strips to be used as airfield) but military environment is very different. There is a small chance that Finland will make Eurofighter to survive until Canadian order and smaller chance for Super Hornet (if that is politically eligible for Canada anyway, but which is then).

It does depend. While Rafale will have domestic orders past 2022 the UK and Italian Eurofighter lines will be reliant on exports, which are already identified, as I don’t see any further orders coming from the partner nations.

There has been a change in the fortunes of the SH and a saving grace for Boeing as the US in their just released defence budget stated a plan to continue procuring SH, so that will continue into the early 2020s, ensuring that there is at least a production line available to order from. I haven’t seen any reports further to the earlier statement that Boeing hadn’t even bothered to turn up to the Industry brief and signaled their intent by the 9th of February. I haven’t found any news reports on this either.

Finland will probably end up making their decision either the year before or at about the same time as Canada so it will be interesting to see how they go.

keesje wrote:
I think over the last 3 months the chances for the Rafale have not been reduced. The partnerships between US (Trump), France (Macron), Canada (Trudeau) and Germany (Merkel) changed of time. The US decided to focus on their own needs / interest and that's their good right.

Given the Canadians will be making the final decision in 2022 I doubt Trump will be a factor. Despite your suggestion Canada is still close to the US politically and militarily and the demands of NORAD “trump” those of NATO, especially under Trudeau. While Rafale is certainly not excluded from the competition there are some obvious issues with selecting it, including integrating into the NORAD structure, weapons compatibility and the lack of industrial support or industry return. Plus it will not be either the most capable platform or the cheapest in 2022 when the decision is made.
 
bigjku
Posts: 1906
Joined: Sat Feb 17, 2007 10:51 pm

Re: Canada - Future Fighter Capability Project

Tue Feb 13, 2018 8:48 pm

I feel like equally as likely as any order getting placed is Canada simply not buying anything at all. They are trending more and more in that direction. I wouldn’t be stunned if they just get out of the business.
 
ExMilitaryEng
Posts: 759
Joined: Mon May 01, 2017 7:12 pm

Re: Canada - Future Fighter Capability Project

Wed Feb 14, 2018 5:42 pm

bigjku wrote:
I wouldn’t be stunned if they just get out of the business.

:rotfl:

That would result in quite a lot of savings; so let's cut defense spending! (As some of our European NATO allies are already doing).
 
ExMilitaryEng
Posts: 759
Joined: Mon May 01, 2017 7:12 pm

Re: Canada - Future Fighter Capability Project

Wed Feb 14, 2018 8:35 pm

Ozair wrote:
If we take that US$20 billion and divide by the 88 aircraft then Canada pays an extra US$220 million for each jet in dev costs… They could of course do it on the cheap and buy an existing radar, engine, EW suite etc but that just translates to Canada system integrating, and taking all the associated risk that brings, while providing little benefit to Canadian Industry.

(Hypothetic discussion here obviously) If we are to spend that kind of money for an indigenous fighter program with little hope for exports, may as well look for another type of aircraft that we can actually profitably export.

Let's make a RFP for a Maritime Patrol Aircraft, a Military transport, and why not, a refueller, all of which would be (curiously :mrgreen: ) exactly tailored to the specs of a CS500. (And with the exact same dimensions as we want them to fit in some specific hangars) :twisted:

Obviously, get the government to pay 100% of the R&D and the certification process. :stirthepot:
 
cumulushumilis
Posts: 248
Joined: Wed Jul 27, 2016 8:49 pm

Re: Canada - Future Fighter Capability Project

Fri Feb 16, 2018 3:58 am

ExMilitaryEng wrote:
bigjku wrote:
I wouldn’t be stunned if they just get out of the business.

:rotfl:

That would result in quite a lot of savings; so let's cut defense spending! (As some of our European NATO allies are already doing).



We just did the opposite and bought back into the NATO AWACS program that the Conservatives withdrew us from in 2011.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Sun Feb 18, 2018 8:27 pm

So it appears that Boeing has decided to join the competition to replace the CF-18.

Boeing stays in race to supply Canada with fighter jets: sources

OTTAWA (Reuters) - Boeing Co, locked in a trade dispute with the Canadian government, has applied to stay in the race to supply Canada with 88 new fighter jets, three well-placed sources said on Thursday.

Companies had until Feb. 9 to express an interest in taking part in a competition for planes worth between C$15 billion ($12.1 billion) and C$19 billion. Ottawa will release its specifications next year, at which point firms can bid.

Boeing did let Canada know it was interested, said the sources, who requested anonymity because they were not authorized to speak to the media. The decision does not mean the firm will necessarily put forward its F-18 Super Hornet.

Boeing did not immediately respond to a request for comment.

https://www.reuters.com/article/us-cana ... SKCN1FZ2M9

Not sure what else Boeing would offer other tha the F-18, I don't see how the F-15 would be selected by Canada.

Noting the article mentioning the anonymity of the source, it is worth posting this news report on how the Liberals continue to undertake unprecedented steps to ensure there is little clarity to this competition.

Don't talk to journalists, Canadian government warns companies interested in fighter jet contract

Companies interested in the Liberal government’s planned purchase of new fighter jets have been told not to talk to journalists despite claims by federal officials the process will be open and transparent.

Those company representatives taking part in the Jan. 22 industry day in Ottawa, which outlined initial details about the proposed $19 billion acquisition, were required to sign a form agreeing not to share information with the media, according to documents obtained by Postmedia.

“Your registration to this event acknowledges your agreement to not share information or materials obtained at the event with the media, and certifies that you are not a member of the media,” the form noted.

The Liberal government’s quest to buy new fighter jets has been controversial, with mixed signals and bungled deals.

Prime Minister Justin Trudeau said earlier his government would not buy the F-35 stealth fighter, claiming it didn’t work. His government later reversed course, adding that F-35 manufacturer Lockheed Martin was welcome to offer their plane to Canada in any competition.

In 2016, the Liberals launched a plan to buy new Super Hornet jets from Boeing as an interim measure, only to scuttle that deal a year later because of a trade war involving the U.S. firm.

Instead, the government says it will now buy used F-18 jets from Australia.

The gag order on the industry day event was forwarded to Postmedia by company representatives concerned about the excessive government secrecy on a program that will cost taxpayers $19 billion.

Public Services and Procurement Canada did not comment on the issue.

But it is not the first attempt by the Liberals to crack down on what information might make its way to the public or news media about the multi-billion program.

In November 2016 it was revealed the Liberal government brought in an unprecedented gag order that prevents 235 Canadian military personnel and federal workers from ever talking about the program.

The non-disclosure agreement for the equipment project puts the fighter jet replacement on the same level as top secret counter-terrorism missions undertaken by the Joint Task Force 2 commando unit as well as clandestine operations by the country’s spies, military sources say.

The permanent non-disclosure agreements were uncovered by Conservative defence critic James Bezan after he requested information through the House of Commons “inquiry of ministry” process.

The information provided to Bezan noted that 121 individuals at the Department of National Defence were required to sign the non-disclosure agreement, 39 at Public Services and Procurement Canada; and 18 at Innovation, Science and Economic Development Canada. The rest of the 235 were employed by the Department of Finance, Treasury Board, Department of Justice and Privy Council Office.

Five other individuals working on the fighter jet replacement project who are under contract to DND were also required to sign the non-disclosure agreement or NDA.

“The NDA is a life-time agreement,” the response to Bezan noted. Persons signing the NDA are considered “persons permanently bound to secrecy” on the future fighter jet capability project, it added.

Defence industry executives and retired public servants say they have never seen such secrecy surrounding an equipment program.

The DND claimed that such agreements have been used with procurement staff before on occasion.

But Alan Williams, the former assistant deputy minister for materiel at the DND, has said that he had never heard of such agreements. Over the years Williams oversaw hundreds of equipment projects at both DND and Public Works, worth billions of dollars.

The fighter jet industry day involved some 200 participants from 108 companies. Some of those who attended questioned why government officials at the meeting could only provide basic details about the fighter jet program. Industry representatives noted that the purchase, which would see a contract awarded in 2021 or 2022, seems drawn out, considering federal procurement officials have been involved in trying to buy a new jet since 2010.

http://nationalpost.com/news/politics/d ... t-contract
 
ExMilitaryEng
Posts: 759
Joined: Mon May 01, 2017 7:12 pm

Re: Canada - Future Fighter Capability Project

Mon Feb 19, 2018 12:15 am

I guess the Liberals don't want the public to know that the F-35 might end up the only suitable choice remaining.

We'll all get to know more after the election...
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Fri Feb 23, 2018 2:26 am

Now confirmed by the Canadian Government that Boing is one of the vendors for the CF-18 replacement. No surprise right now on the 5 respective candidates but I wonder how many will drop off over the next two years as further details and requirements for the new project are released.

Boeing rejoins competitive field for Canadian fighter deal

The Canadian government has announced that five bidders — Boeing, Dassault, Eurofighter, Lockheed Martin and Saab — are eligible to compete for a long sought-after contract to replace the country’s 88 CF-18 fighters.

The disclosure of the Future Fighter Capabilities Project (FFCP)’s official Supplier’s List ends a mystery about whether Boeing would decline to participate after angering Canadian government officials.

The Supplier’s List shows that Royal Canadian Air Force’s options remain plentiful, with the Typhoon, Rafale, Gripen, Super Hornet and F-35 Lightning II available for purchase. The release of the government’s Supplier’s List does not mean the companies are committed to submitting bids for the contract award scheduled 2021 or 2022.

“We will continue to evaluate our participation in the FFCP as the Government of Canada outlines the procurement approach, requirements and evaluation criteria,” Boeing says.

https://www.flightglobal.com/news/artic ... te-446146/
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Thu Apr 19, 2018 1:57 am

Some additional info on the Canadian fighter replacement program. Bringing in an independent third party reviewer is a good idea and will hopefully alleviate some of the concerns people have with the competition and the final selection.

Update on new fighter jet project to replace CF-18 fleet

The federal government has embarked on a couple of initiatives to support the project to buy a new fleet of fighter jets for the RCAF. The aircraft will replace the air force’s CF-18s.

Through a Request for Proposal issued Tuesday, the Canadian government will be hiring an independent third-party reviewer to help validate various procurement documents and support processes relating to the Future Fighter Capability Project. The reviewer’s role will be to provide defence procurement and financial expert analysis to ensure that the procurement approach “is designed to deliver the desired outcomes,” according to Public Services and Procurement Canada.

The list of eligible suppliers for the new fighter jet includes the following teams (in alphabetical order):

France—Dassault Aviation (Thales DMS France SAS and Safran Aircraft Engines)
Sweden—SAAB AB (publ)—Aeronautics
United Kingdom and Northern Ireland—Airbus Defense and Space GmbH
United States—Lockheed Martin Corporation (Lockheed Martin Aeronautics Company)
United States—The Boeing Company
Only these suppliers will be invited to participate in subsequent formal engagement activities and to submit proposals, according to the government.

In parallel with discussions with these suppliers, the Canadian government will continue to talk to other firms to gather and share general information related to the procurement. This aims to make sure that Canadian aerospace and defence firms can play a role in the procurement.


Innovation, Science and Economic Development, in partnership with National Defence and Public Services and Procurement will conduct regional forums across Canada, according to the federal government. These forums, to be held in the cities listed below, will be an opportunity for the Canadian aerospace and defence sectors to learn more about the Industrial and Technological Benefits Policy including the Value Proposition and to engage with potential prime contractors:

Monday, April 23—Ottawa, Ontario
Tuesday, April 24—Toronto, Ontario
Wednesday, April 25—Winnipeg, Manitoba
Friday, April 27—Vancouver, British Columbia
Monday, April 30—Halifax, Nova Scotia
Tuesday, May 1—Montreal, Quebec

http://ottawacitizen.com/news/national/ ... f-18-fleet
 
ThePointblank
Posts: 4426
Joined: Sat Jan 17, 2009 11:39 pm

Re: Canada - Future Fighter Capability Project

Fri Jul 27, 2018 3:44 am

The Auditor General is investigating claims that there was a 'capability gap' and a stopgap was needed to fill the gap immediately:

https://www.theglobeandmail.com/canada/ ... aims-of-a/

Canada’s auditor general has started to dig into one of the Trudeau government’s most contentious claims, upon which rests the fate of hundreds of millions of taxpayer dollars: that the country is facing an urgent shortage of fighter jets.

The claim was first made in November, 2016, when the Liberals announced that Canada didn’t have enough fighter jets to defend North America and simultaneously meet the country’s NATO commitments, and that a stopgap was urgently needed until the entire CF-18 fleet could be replaced.

The government originally planned to buy 18 interim Super Hornets from Boeing for $6.4-billion before the deal was scuttled late last year in favour of buying 25 used jets from Australia for $500-million.

But critics, including opposition parties and former air force commanders, accuse the government of fabricating an urgent “capability gap” – as the shortfall is known – by changing the military’s requirements to avoid having to buy the F-35 stealth fighter.


The Auditor General is also investigating the costs and impact for extending the life of the CF-18 fleet. This report should be out in the fall.
 
bigjku
Posts: 1906
Joined: Sat Feb 17, 2007 10:51 pm

Re: Canada - Future Fighter Capability Project

Fri Jul 27, 2018 4:51 pm

ThePointblank wrote:
The Auditor General is investigating claims that there was a 'capability gap' and a stopgap was needed to fill the gap immediately:

https://www.theglobeandmail.com/canada/ ... aims-of-a/

Canada’s auditor general has started to dig into one of the Trudeau government’s most contentious claims, upon which rests the fate of hundreds of millions of taxpayer dollars: that the country is facing an urgent shortage of fighter jets.

The claim was first made in November, 2016, when the Liberals announced that Canada didn’t have enough fighter jets to defend North America and simultaneously meet the country’s NATO commitments, and that a stopgap was urgently needed until the entire CF-18 fleet could be replaced.

The government originally planned to buy 18 interim Super Hornets from Boeing for $6.4-billion before the deal was scuttled late last year in favour of buying 25 used jets from Australia for $500-million.

But critics, including opposition parties and former air force commanders, accuse the government of fabricating an urgent “capability gap” – as the shortfall is known – by changing the military’s requirements to avoid having to buy the F-35 stealth fighter.


The Auditor General is also investigating the costs and impact for extending the life of the CF-18 fleet. This report should be out in the fall.


This should let Canada delay things yet again. It seems like it’s just time to fess up. Canada has no intention of actually defending itself of contributing militarily to NATO. The budget keeps being cut and actual programs keep getting put off.

The fighter plans are a joke. The frigate program has been delayed and delayed and I won’t be shocked if it gets rebid. The submarine program has been awful. The army has been reduced to almost nothing in terms of combat power really.
 
User avatar
Kiwirob
Posts: 14853
Joined: Mon Jun 13, 2005 2:16 pm

Re: Canada - Future Fighter Capability Project

Sat Jul 28, 2018 7:48 am

bigjku wrote:

The fighter plans are a joke. The frigate program has been delayed and delayed and I won’t be shocked if it gets rebid. The submarine program has been awful. The army has been reduced to almost nothing in terms of combat power really.


Buy Type 26 like the Aussies did and reap the rewards in being part of a large program.
 
bigjku
Posts: 1906
Joined: Sat Feb 17, 2007 10:51 pm

Re: Canada - Future Fighter Capability Project

Sat Jul 28, 2018 10:31 am

Kiwirob wrote:
bigjku wrote:

The fighter plans are a joke. The frigate program has been delayed and delayed and I won’t be shocked if it gets rebid. The submarine program has been awful. The army has been reduced to almost nothing in terms of combat power really.


Buy Type 26 like the Aussies did and reap the rewards in being part of a large program.


Agree there. A good sign they are serious about turning budget into capability would be if they bought them from the U.K. yards as well.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Oct 30, 2018 9:14 pm

No really much in the way of new information but the submission of bids by May next year. I'd expect some sort of down selection from the five bidders to perhaps two before final offers are tabled.

Canada to accept bids for new fighter jet in May — here are the potential competitors

Canada expects to accept formal bids for a new fighter jet in May, with the first aircraft delivered by 2025, according to Canadian government procurement officials.

A draft bid package for 88 fighters was issued to companies for their feedback by the end of this year, said Pat Finn, assistant deputy minister for materiel at the Department of National Defence. From there, the final bidding instructions for the CA$16 billion (U.S. $12 billion) procurement will be issued and bids required by May 2019, he added.

The aircraft will replace Canada’s current fleet of CF-18 fighter jets. The aircraft expected to be considered include Lockheed Martin’s F-35, the Eurofighter Typhoon, the Dassault Rafale, Saab’s Gripen and the Boeing Super Hornet.

The Canadian government will require a robust package of guaranteed industrial benefits or offsets from the winning bidder, government officials said. But that could be a problem for the F-35, as Canada is still a partner in that program, which does not guarantee participating-nations contracts. Work on the F-35 program is based on best value and price.

Canadian industrial participation in the F-35 program has reached $1 billion, as more than 110 Canadian firms have landed contracts related to the aircraft program.

Jeff Waring, director general for industrial benefits policy at the federal Innovation, Science and Economic Development Canada, said the country sees the fighter jet program as a “once-in-a-generation opportunity for the Canadian economy.”

But he noted the industrial benefits policy is flexible. “It is a market-driven approach,” he said. “It encourages suppliers to make investments that make sense to them.”

The issue of industrial benefits has already been discussed with companies interested in bidding on the project, and those talks will continue as feedback is received on the draft bid package, government officials said.

https://www.defensenews.com/global/the- ... mpetitors/
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Oct 31, 2018 8:33 pm

Canada continues to try its luck at “having its cake and eating it too”. They continue to pay F-35 program dues to maintain F-35 contracts then run an open competition to select their new fighter aircraft. If the aircraft is not the F-35 then out of the Industrial program they will go, no matter what they have paid to date.

Many of the partner nations will be happy to see them go if it provides more opportunity for their own industries.

Ottawa sticking to F-35 program as it gets ready for full fighter competition

Canada is facing a complex challenge as it gets ready to launch a full competition for new fighter jets stemming from its long-standing involvement in the international coalition that is building the Lockheed Martin Corp. F-35 stealth aircraft.

The federal government confirmed on Monday that it will maintain its membership in the F-35 consortium. At the same time, Ottawa is getting ready to send out requests for proposals for new fighter jets to five potential bidders, including Lockheed Martin.

Federal officials insist that all bidders will have to adhere to Canada’s Industrial and Technological Benefits policy (ITB), which requires the winning supplier to “make investments in Canada equal to the value of the contract." The cost of replacing the Royal Canadian Air Force’s current fleet of CF-18s is estimated at $26-billion.

Under the rules of the F-35 consortium, however, partner countries such as Canada must forego such regional offset programs, which have long been a central element of Canadian military acquisitions. Earlier this year, Canada paid $54-million to remain in the F-35 buyers’ pool.

“We’re keeping our involvement alive to get access to that product at the best possible terms,” Pat Finn, an assistant deputy minister at the Department of National Defence, said in an interview on Monday. “If the F-35 were to win, the lowest cost access to the aircraft is through the partnership. Having been involved from the outset, we don’t want to lose the privilege of that."

Since 1997, Canada has paid nearly half a billion dollars to stay in the F-35 consortium.
Jeff Waring, a director-general at Innovation, Science and Economic Development Canada, said it will be up to Lockheed Martin to determine how it can meet Canada’s requirement for regional offsets if it wants to bid on the contract.

“The ITB policy is a market-driven approach; it doesn’t prescribe to bidders how they need to invest in Canada,” he said.
The federal government has nearly finalized its request for proposal for the new fighter jets. It is now waiting for industry feedback over the next six weeks before launching the formal competition next year.

Three European companies (Dassault Aviation, Saab Automobile and Airbus) and two American companies (Lockheed Martin and Boeing Co.) have said they intend to bid on the contract.

In the draft request for proposal, the government has laid out new details on its “economic impact test” that will penalize companies that are deemed to have a negative effect on the Canadian economy. When it was announced last year, the test was dubbed the “Boeing clause” because of U.S.-based Boeing’s trade dispute with Canada’s Bombardier Inc., which Bombardier subsequently won.

The new measure is expected to look at whether companies have launched a trade action in the two previous years against a Canadian company. Given Boeing launched its case against Bombardier in 2017, it will likely be in the clear by the time it would have to submit a final bid in 2020.

The previous Conservative government had committed to buying F-35 fighter jets, which were deemed at the time to be the only aircraft able to meet Canada’s requirements, in large part because of their stealth capabilities.

The current Liberal government has modified the requirements to make sure there can be competition between the various manufacturers.

“If your aircraft cannot meet [a requirement] today, we are not saying automatically that you’re out; but you have to tell us what is your solution to meet it, at what price and what schedule,” said Mr. Finn.

In the last federal election, the Liberals said in their platform that they would not buy the F-35, promising instead to select “one of the many, lower-priced options that better match Canada’s defence needs.”

However, the Liberals also promised to launch an “open and transparent” competition, which is now scheduled to be launched in May.

https://www.theglobeandmail.com/politic ... l-fighter/
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Nov 07, 2018 1:36 am

keesje wrote:
I think over the last 3 months the chances for the Rafale have not been reduced.

The following may be a surprise to supporters of the Rafale in Canada... Nothing confirmed yet but it seems likely that Dassault will pull out and you would subsequently expect Saab to probably pull out as well for similar information sharing reasons. Saab may have BAE backing for their information sharing but the cost to bid will be high. Add in BAE having a stake in both the Eurofighter and the F-35 and it seems unlikely that the Gripen will be competitive.

French firm Dassault pulls out of fighter-jet competition: Sources

The long effort to replace Canada’s aging fighter jets took another surprise twist on Tuesday, as multiple sources revealed that French fighter-jet maker Dassault is pulling out of the multibillion-dollar competition.

The decision comes just over a week after the federal government published the military’s requirements for a replacement for Canada’s CF-18s as well as a draft process by which a winning supplier will be chosen.

Dassault had repeatedly pitched its Rafale aircraft to Canada over the years as successive governments in Ottawa have wrestled with selecting a new fighter jet. Dassault’s pitch included significant promises, including that it would assemble the planes in Canada.

But sources tell The Canadian Press that Dassault’s decision to withdraw was related to the fact France is not a member of the Five Eyes intelligence-sharing network, which counts the U.S., Britain, Australia, New Zealand and Canada as members. The five members have very specific requirements for how their equipment works together.

The French government, which had been closely working with Dassault as the most recent iteration of Canada’s fighter-replacement program has inched along over the past year, was preparing to notify Ottawa of the company’s withdrawal.

The move leaves four companies — U.S. aerospace giants Lockheed Martin and Boeing, European competitor Airbus and Swedish firm Saab — competing for the $19-billion contract to replace Canada’s 76 CF-18s with 88 new fighters.

A contract isn’t expected to be awarded until 2021 or 2022, with delivery of the first new aircraft slated for 2025. In the meantime, the government is planning to upgrade its CF-18s and buy 25 used fighters from Australia as a stopgap.

Dassault faced several significant challenges in meeting Canada’s requirements for a new fighter, said defence analyst David Perry of the Canadian Global Affairs Institute, and while they weren’t insurmountable, they would have cost time and money.

Those challenges included meeting those Five-Eyes intelligence-sharing requirements, which Perry said put Dassault at a distinct disadvantage in the competition when compared to Lockheed Martin, Boeing and, to a certain degree, Airbus.

“For any of the non-American companies, solving the Five-Eyes interoperability issues is going to be challenging,” he said, noting that the U.S. in particular is very sensitive about data-sharing.

“And it costs companies a lot of money to mount and pursue bids. So if they think at this point in time that it’s not a realistic prospect, then pulling out is pretty understandable.”

That could explain why Dassault never established a strong presence in Canada during the many years when it was trying to sell the Rafale as a replacement for the CF-18, he added.

The CF-18s are about 35 years old. Canada’s attempts to buy a new fighter jet have dragged on for nearly a decade after the previous Conservative government announced in 2010 that Canada would buy 65 F-35s without a competition, with the first to be delivered in 2015.

But the Tories pushed the reset button in 2012 after the auditor general raised questions about the program and National Defence revealed the jets would cost $46 billion over their lifetimes.

After campaigning on a promise not to buy the F-35s, the Trudeau Liberals announced in November 2016 they would take their time with a competition to replace the CF-18s, and buy 18 “interim” Boeing Super Hornets without a competition because Canada needed more fighter jets badly.

But then Boeing’s trade dispute with Canadian rival Bombardier saw the Liberals scrap their plan to buy Super Hornets and instead begin talks to buy 18 used fighter jets from Australia. A contract for those used planes is expected in the coming weeks.

The formal competition to replace the CF-18s is scheduled to begin next spring.

https://vancouversun.com/pmn/news-pmn/c ... 6317a46fd2
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Wed Nov 07, 2018 5:54 pm

Ozair wrote:
keesje wrote:
I think over the last 3 months the chances for the Rafale have not been reduced.

The following may be a surprise to supporters of the Rafale in Canada... Nothing confirmed yet but it seems likely that Dassault will pull out and you would subsequently expect Saab to probably pull out as well for similar information sharing reasons. Saab may have BAE backing for their information sharing but the cost to bid will be high. Add in BAE having a stake in both the Eurofighter and the F-35 and it seems unlikely that the Gripen will be competitive.

French firm Dassault pulls out of fighter-jet competition: Sources

The long effort to replace Canada’s aging fighter jets took another surprise twist on Tuesday, as multiple sources revealed that French fighter-jet maker Dassault is pulling out of the multibillion-dollar competition.

The decision comes just over a week after the federal government published the military’s requirements for a replacement for Canada’s CF-18s as well as a draft process by which a winning supplier will be chosen.

Dassault had repeatedly pitched its Rafale aircraft to Canada over the years as successive governments in Ottawa have wrestled with selecting a new fighter jet. Dassault’s pitch included significant promises, including that it would assemble the planes in Canada.

But sources tell The Canadian Press that Dassault’s decision to withdraw was related to the fact France is not a member of the Five Eyes intelligence-sharing network, which counts the U.S., Britain, Australia, New Zealand and Canada as members. The five members have very specific requirements for how their equipment works together.

The French government, which had been closely working with Dassault as the most recent iteration of Canada’s fighter-replacement program has inched along over the past year, was preparing to notify Ottawa of the company’s withdrawal.

The move leaves four companies — U.S. aerospace giants Lockheed Martin and Boeing, European competitor Airbus and Swedish firm Saab — competing for the $19-billion contract to replace Canada’s 76 CF-18s with 88 new fighters.

A contract isn’t expected to be awarded until 2021 or 2022, with delivery of the first new aircraft slated for 2025. In the meantime, the government is planning to upgrade its CF-18s and buy 25 used fighters from Australia as a stopgap.

Dassault faced several significant challenges in meeting Canada’s requirements for a new fighter, said defence analyst David Perry of the Canadian Global Affairs Institute, and while they weren’t insurmountable, they would have cost time and money.

Those challenges included meeting those Five-Eyes intelligence-sharing requirements, which Perry said put Dassault at a distinct disadvantage in the competition when compared to Lockheed Martin, Boeing and, to a certain degree, Airbus.

“For any of the non-American companies, solving the Five-Eyes interoperability issues is going to be challenging,” he said, noting that the U.S. in particular is very sensitive about data-sharing.

“And it costs companies a lot of money to mount and pursue bids. So if they think at this point in time that it’s not a realistic prospect, then pulling out is pretty understandable.”

That could explain why Dassault never established a strong presence in Canada during the many years when it was trying to sell the Rafale as a replacement for the CF-18, he added.

The CF-18s are about 35 years old. Canada’s attempts to buy a new fighter jet have dragged on for nearly a decade after the previous Conservative government announced in 2010 that Canada would buy 65 F-35s without a competition, with the first to be delivered in 2015.

But the Tories pushed the reset button in 2012 after the auditor general raised questions about the program and National Defence revealed the jets would cost $46 billion over their lifetimes.

After campaigning on a promise not to buy the F-35s, the Trudeau Liberals announced in November 2016 they would take their time with a competition to replace the CF-18s, and buy 18 “interim” Boeing Super Hornets without a competition because Canada needed more fighter jets badly.

But then Boeing’s trade dispute with Canadian rival Bombardier saw the Liberals scrap their plan to buy Super Hornets and instead begin talks to buy 18 used fighter jets from Australia. A contract for those used planes is expected in the coming weeks.

The formal competition to replace the CF-18s is scheduled to begin next spring.

https://vancouversun.com/pmn/news-pmn/c ... 6317a46fd2


The French are escalating the topic, lets see what happens. How are the government relations these days?
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Nov 07, 2018 8:33 pm

keesje wrote:
The French are escalating the topic, lets see what happens. How are the government relations these days?

That is highly unlikely Keesje, Trudeau won’t be able to change the NORAD specific requirements of the tender, especially as the tender documents have already been released to the respective bidders. It would create an instant protest point and with an election less than 12 months away Trudeau doesn't need that kind of publicity.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Nov 07, 2018 9:22 pm

Just to make it clear what the issue around Five Eyes data is you can read the following, https://www.aeromontreal.ca/download/fc ... LETIER.pdf in which slide 7 goes specifically into the information issue.

On slide 11 we see how important that sharing is, with it listed as the number one requirement

1 Interoperability : NORAD, NATO, safeguard shared 5/2 Eyes intelligence
2 Upgradeability : Ability to maintain Operational Advantage against current and future threats
3 Performance: Range, endurance and speeds required in NORAD and NATO mission configurations
4 Awareness : Ability to gather intelligence, detect, track, identify, assess in permissive and contested environments
5 Survivability : Ability to operate in permissive and contested environment
6 Lethality : Ability to effectively carry out its assigned tasks in permissive and contested environment
7 Sustainability: Ability to sustain Force Generation and Force Employment systems throughout service life


Obviously this is the RCAF side of the deal and there is the industry participation side that has to be considered but you get the idea of how important and valued that information relationship is. To put it clearly, it transcends the political rabble.

To give further understanding to the difference in information sharing between respective nations, there is the ACURL lab for F-35 at Eglin which handles specific F-35 mission programming for Australia, Canada and the UK.

In the US a software reprogramming laboratory is also under construction, which will support JSF aircraft from Australia, Canada (should Canada eventually purchase the F-35) and the UK. Known as the ACURL (Australia, Canada, UK Reprogramming Laboratory), the facility is adjacent to a similar USRL (for the US Air Force, Navy and Marine Corps) and NIRL (for Norway and Italy). A further reprogramming laboratory will support the remaining partner nations and FMS customers at NAS Point Mugu in California.

http://www.australiandefence.com.au/def ... -lightning
 
ThePointblank
Posts: 4426
Joined: Sat Jan 17, 2009 11:39 pm

Re: Canada - Future Fighter Capability Project

Thu Nov 08, 2018 12:00 am

Ozair wrote:
keesje wrote:
The French are escalating the topic, lets see what happens. How are the government relations these days?

That is highly unlikely Keesje, Trudeau won’t be able to change the NORAD specific requirements of the tender, especially as the tender documents have already been released to the respective bidders. It would create an instant protest point and with an election less than 12 months away Trudeau doesn't need that kind of publicity.

On top of that, the Rafale would have been an extreme long shot anyways; buying the Rafale means scrapping all existing munitions, pods and support hardware in favour of their (more expensive) French equivalents.

And trying to integrate existing weapons and pods onto the Rafale means extensive development, certification, and testing requirements that would be fraught with risk and costs.
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Thu Nov 08, 2018 4:26 pm

ThePointblank wrote:
Ozair wrote:
keesje wrote:
The French are escalating the topic, lets see what happens. How are the government relations these days?

That is highly unlikely Keesje, Trudeau won’t be able to change the NORAD specific requirements of the tender, especially as the tender documents have already been released to the respective bidders. It would create an instant protest point and with an election less than 12 months away Trudeau doesn't need that kind of publicity.

On top of that, the Rafale would have been an extreme long shot anyways; buying the Rafale means scrapping all existing munitions, pods and support hardware in favour of their (more expensive) French equivalents.

And trying to integrate existing weapons and pods onto the Rafale means extensive development, certification, and testing requirements that would be fraught with risk and costs.


Things are moving. Agreements, cooperation, self evident follow ups, all seems to be up for discussion / change lately. Specially in this field.
https://globalnews.ca/video/4490794/trump-slams-canada-on-nafta
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Thu Nov 08, 2018 7:52 pm

keesje wrote:
ThePointblank wrote:
Ozair wrote:
That is highly unlikely Keesje, Trudeau won’t be able to change the NORAD specific requirements of the tender, especially as the tender documents have already been released to the respective bidders. It would create an instant protest point and with an election less than 12 months away Trudeau doesn't need that kind of publicity.

On top of that, the Rafale would have been an extreme long shot anyways; buying the Rafale means scrapping all existing munitions, pods and support hardware in favour of their (more expensive) French equivalents.

And trying to integrate existing weapons and pods onto the Rafale means extensive development, certification, and testing requirements that would be fraught with risk and costs.


Things are moving. Agreements, cooperation, self evident follow ups, all seems to be up for discussion / change lately. Specially in this field.
https://globalnews.ca/video/4490794/trump-slams-canada-on-nafta

Keesje your link is almost two months old and doesn't have any relevance to the current situation or the fighter procurement.
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Thu Nov 08, 2018 11:19 pm

Ozair wrote:
keesje wrote:
ThePointblank wrote:
On top of that, the Rafale would have been an extreme long shot anyways; buying the Rafale means scrapping all existing munitions, pods and support hardware in favour of their (more expensive) French equivalents.

And trying to integrate existing weapons and pods onto the Rafale means extensive development, certification, and testing requirements that would be fraught with risk and costs.


Things are moving. Agreements, cooperation, self evident follow ups, all seems to be up for discussion / change lately. Specially in this field.
https://globalnews.ca/video/4490794/trump-slams-canada-on-nafta

Keesje your link is almost two months old and doesn't have any relevance to the current situation or the fighter procurement.



- The previous SuperHorner deal killed because of it.
The Canadian government’s December announcement did not come as a surprise, partly because of the news leaks earlier in the week, but also because of a rupture in relations between Canada and Boeing earlier in 2017 after the U.S. aerospace giant launched an unfair trade claim against Bombardier Aerospace of Montreal.
https://ipolitics.ca/2018/03/04/canada-gave-u-s-just-hours-notice-not-buy-super-hornets/

- The relation is what it is.
https://eu.usatoday.com/story/news/politics/2018/11/01/trade-wars-canada-not-ready-forgive-trumps-insulting/1648045002/
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Fri Nov 09, 2018 1:04 am

keesje wrote:
- The previous SuperHorner deal killed because of it.
The Canadian government’s December announcement did not come as a surprise, partly because of the news leaks earlier in the week, but also because of a rupture in relations between Canada and Boeing earlier in 2017 after the U.S. aerospace giant launched an unfair trade claim against Bombardier Aerospace of Montreal.
https://ipolitics.ca/2018/03/04/canada-gave-u-s-just-hours-notice-not-buy-super-hornets/

And yet Boeing is one of the Vendors selected and admitted for the bid. Five, now almost certainly four, who will bid clearly means relations are not that bad that they are excluded up front. Three of the vendors have significant US content in their jets and as already stated up the thread Canada continues to pay its dues to the F-35 Industrial program.

keesje wrote:

Keesje, seen from the RCAF/NORAD perspective the relationship is fine. Seen from the industry perspective, where Canadian companies contribute heavily to the US economy, it is fine.

Step away from the bluster of media reporting and you will see that things are humming along as they always have and will continue to, despite two political leaders with heads bigger than their boots having their egos dented.
 
ThePointblank
Posts: 4426
Joined: Sat Jan 17, 2009 11:39 pm

Re: Canada - Future Fighter Capability Project

Fri Nov 09, 2018 4:03 am

keesje wrote:
Ozair wrote:
keesje wrote:

Things are moving. Agreements, cooperation, self evident follow ups, all seems to be up for discussion / change lately. Specially in this field.
https://globalnews.ca/video/4490794/trump-slams-canada-on-nafta

Keesje your link is almost two months old and doesn't have any relevance to the current situation or the fighter procurement.



- The previous SuperHorner deal killed because of it.
The Canadian government’s December announcement did not come as a surprise, partly because of the news leaks earlier in the week, but also because of a rupture in relations between Canada and Boeing earlier in 2017 after the U.S. aerospace giant launched an unfair trade claim against Bombardier Aerospace of Montreal.
https://ipolitics.ca/2018/03/04/canada-gave-u-s-just-hours-notice-not-buy-super-hornets/

- The relation is what it is.
https://eu.usatoday.com/story/news/politics/2018/11/01/trade-wars-canada-not-ready-forgive-trumps-insulting/1648045002/

The previous Super Hornet deal got canned because of the optics of buying from a company that was directly involved in harming the Canadian government's investment in domestic industry was terrible, and every military official told the government that they had no need for the Super Hornet, could not supply the personnel to operate the type, could not afford to operate the type, and didn't want the type.

They only bought the Australian Hornet's to save face; the government created a fake capability gap to originally justify the purchase of the Super Hornet, so they need to do something to fix the problem they created for themselves; hence the purchase of the Australian fleet of Hornets to save face at taxpayers’ expense regarding the fictitious gap, while the reference to ‘economic harm’ by Boeing was a puerile attempt to deflect the issue from a case of government manipulation of the procurement process to one of economic indignation against Boeing.
 
ThePointblank
Posts: 4426
Joined: Sat Jan 17, 2009 11:39 pm

Re: Canada - Future Fighter Capability Project

Fri Dec 28, 2018 5:31 am

The criteria for the so called "Boeing Clause" will be released next year:

https://ottawacitizen.com/news/national ... e-new-year

The assessment tool is still being finalized for this clause, and industry consultation is still occurring.
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Mon Dec 31, 2018 2:09 am

I think the US government stood firm with Boeing in the DoC CSeries case against BBD/Delta.
This was after Boeing showed no interest in cooperating with BBD on the Cseries, which drove them in Airbus hands later on.
A solid implementation of the America First strategy publicly set out by the presidency the year before.
Despite Trudeau & May asking the President to avoid government interference, 300% import tarrifs were set.
The US government had all the rights to do so, it helps US jobs and economy. And now it is Canada First.
 
ExMilitaryEng
Posts: 759
Joined: Mon May 01, 2017 7:12 pm

Re: Canada - Future Fighter Capability Project

Fri Jan 04, 2019 2:42 am

It's more like putting Boeing "last" (versus Canada first) as we'll probably end up ordering the US made F35. But hey, since that last NAFTA renegociation - maybe we should maybe look more toward Europe. (Apparently our trade deficit with the US is irrelevant, so it's ok to be treated worst than North Korea). Not even sure where NATO is now going...

About that Boeing complaint (which was debated here to death), a vague consensus what agreed around the word "hypocrit" in describing Boeing (which was not producing anything close to the CS100, nor did it offer then any US made aircrafts to Delta).

The only aim (that Boeing openly stated) was to destroy the CSeries and not repeat the same mistake in letting a new entrant (BBD) in the market. Pretty predatory to me if you ask me. I sincerly hope nobody forgets that behevior in Canada.
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Mon Jan 07, 2019 10:23 am

ExMilitaryEng wrote:
It's more like putting Boeing "last" (versus Canada first) as we'll probably end up ordering the US made F35. But hey, since that last NAFTA renegociation - maybe we should maybe look more toward Europe. (Apparently our trade deficit with the US is irrelevant, so it's ok to be treated worst than North Korea). Not even sure where NATO is now going...

About that Boeing complaint (which was debated here to death), a vague consensus what agreed around the word "hypocrit" in describing Boeing (which was not producing anything close to the CS100, nor did it offer then any US made aircrafts to Delta).

The only aim (that Boeing openly stated) was to destroy the CSeries and not repeat the same mistake in letting a new entrant (BBD) in the market. Pretty predatory to me if you ask me. I sincerly hope nobody forgets that behevior in Canada.


If this was a legal action to protect national interest and support local jobs, it calculated in fall-out like this I suppose.

A few weeks ago Dassault withdrew from competition, because of compliance with the Five Eyes intelligence-sharing network. It could be a challenge to find out how un-touchable that cooperation really is, specially if the dominant partner decides to use it to build new Cold War on China. A good old cold war / FUT with enormous defense budgets :cloudnine: How essential is this Five Eyes intelligence-sharing network really for buying a new fighter, if old F18 will do too. It seems CAnada is buyig time. Rewarding Trump with a multi billion order for what he is doing seems unlikely.

https://nationalpost.com/news/politics/french-firm-dassault-pulls-out-of-fighter-jet-competition-sources

If a customized Rafales can be build locally by Canadian industry as part of a bigger cooperation with Dassault and Airbus on a 6th Gen fighter, things could get interesting. It totally political, so lets not over state specifications / technicalities. Many earlier decisions have been winded back in this process.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Jan 08, 2019 12:49 am

keesje wrote:
ExMilitaryEng wrote:
It's more like putting Boeing "last" (versus Canada first) as we'll probably end up ordering the US made F35. But hey, since that last NAFTA renegociation - maybe we should maybe look more toward Europe. (Apparently our trade deficit with the US is irrelevant, so it's ok to be treated worst than North Korea). Not even sure where NATO is now going...

About that Boeing complaint (which was debated here to death), a vague consensus what agreed around the word "hypocrit" in describing Boeing (which was not producing anything close to the CS100, nor did it offer then any US made aircrafts to Delta).

The only aim (that Boeing openly stated) was to destroy the CSeries and not repeat the same mistake in letting a new entrant (BBD) in the market. Pretty predatory to me if you ask me. I sincerly hope nobody forgets that behevior in Canada.


If this was a legal action to protect national interest and support local jobs, it calculated in fall-out like this I suppose.

A few weeks ago Dassault withdrew from competition, because of compliance with the Five Eyes intelligence-sharing network. It could be a challenge to find out how un-touchable that cooperation really is, specially if the dominant partner decides to use it to build new Cold War on China. A good old cold war / FUT with enormous defense budgets :cloudnine: How essential is this Five Eyes intelligence-sharing network really for buying a new fighter, if old F18 will do too. It seems CAnada is buyig time. Rewarding Trump with a multi billion order for what he is doing seems unlikely.

https://nationalpost.com/news/politics/french-firm-dassault-pulls-out-of-fighter-jet-competition-sources

If a customized Rafales can be build locally by Canadian industry as part of a bigger cooperation with Dassault and Airbus on a 6th Gen fighter, things could get interesting. It totally political, so lets not over state specifications / technicalities. Many earlier decisions have been winded back in this process.


Keesje, I said the following in response to a nearly exact comment you made 10 months ago.

Ozair wrote:

Given the Canadians will be making the final decision in 2022 I doubt Trump will be a factor. Despite your suggestion Canada is still close to the US politically and militarily and the demands of NORAD “trump” those of NATO, especially under Trudeau. While Rafale is certainly not excluded from the competition there are some obvious issues with selecting it, including integrating into the NORAD structure, weapons compatibility and the lack of industrial support or industry return. Plus it will not be either the most capable platform or the cheapest in 2022 when the decision is made.

The only thing that has changed is that Dassault has withdrawn from the competition. Clearly there were issues with integrating it into the NORAD structure and information sharing agreements. Building Rafales in Canada won’t change that nor would what you are suggesting be acceptable with Canadian procurement law. Despite what you suggest, it is not all political. Finally as stated above, NORAD is above Trump and Trudeau and both could very well be out of office by the time this competition is selected and certainly by the first aircraft is delivered.

Keesje it is time to face the facts, Rafale is not happening for Canada.
 
RJMAZ
Posts: 3573
Joined: Sat Jul 09, 2016 2:54 am

Re: Canada - Future Fighter Capability Project

Tue Jan 08, 2019 10:40 am

The Australian hornets will be going to Canada.

The deal was sealed yesterday and 18 RAAF Hornets will be going to Canada this year.

http://australianaviation.com.au/2019/0 ... ed-report/
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Jan 08, 2019 11:02 pm

Thought I would post this masters thesis submission that looks at the Canadian Future Fighter Capability project. Unfortunately it is essentially a sales campaign for Saab and Gripen and does not objectively look at what the threat will be to Canadian Military Forces in the future, glosses over the current state of the Gripen and uses some sources that have been previously proven as inaccurate.

CF-39 Arrow II: A Swedish Solution to the CF-18 Replacement Problem

Prime Minister Pierre Trudeau ordered 138 CF-18 fighter jets in 1980. As of September 2018, 76 modernized CF-18s remain in service. Over the past two decades, four different Prime Ministers have been involved in selecting a replacement for the CF-18. With a purchase price of over $16 billion and a potential total lifetime cost of over $40 billion, the CF-18 replacement will be the second most expensive military procurement in Canadian history. Not only will the CF-18 replacement program have to fight for funding against the general austerity and easy riding nature of Canadians, but it will also be running concurrently with the largest military procurement in Canadian history: The National Shipbuilding Strategy.

This paper reviews the history of Canadian military procurement, with emphasis on the successful New Fighter Aircraft (NFA) program of the 1970s that selected the CF-18, and how those lessons should be applied to the CF-18 replacement. This paper argues that, absent the political will to provide considerably more than 1.15% of GDP in defence spending, the Canadian Forces can no longer afford to be a modern multipurpose force and should instead move to a Navy centric force structure. By reviewing how the CF-18 serves at home on the NORAD mission, in Europe on NATO air policing missions, and as part of coalition combat missions; the minimum requirements for the CF-18 replacement are identified.

This paper recommends employing the NFA methodology to design a defence policy for easy riders. Such a defence policy will meet military objectives with best value, state-of the-art technology that also offers full industrial offsets for Canadian industry. The best value solution to the CF-18 replacement is the least expensive jet in the competition: the Saab Gripen.

https://prism.ucalgary.ca/bitstream/han ... sAllowed=y

The irony of the report is that I expect the Saab to withdraw from the Canadian competition at some point in the future before final submission likely for both capability and information sharing reasons similar to Dassault.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Fri Jan 11, 2019 3:04 am

An image outlining the process and timeline as described by the Canadian Government.

Image
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 1:09 am

Not sure why Flight Global are reporting this unless it is just Airbus trying to drum up some news interest in the Eurofighter bid. We have known about a Eurofighter bid for a significant period, after they responded to the Canadian Government's initial RFI.

Interesting if the article is true that Airbus Defence is leading the sales campaign. I would have expected BAE Systems given the intelligence sharing requirements but as the RFP is being released mid-year we won’t know the full impact of those specific requirements on the selection.

Eurofighter Typhoon to bid to replace Canadian CF-18 fleet

Eurofighter, a joint venture among Airbus, BAE Systems and Leonardo, was assumed to be one of the bidders in the competition to replace the RCAF’s fighter fleet with 88 advanced jets, but it hadn’t yet publicly acknowledged its desire to play for the contract. Simon Jacques, head of Airbus defense and space in Canada, said at a company event in Montreal that his firm intends to submit a proposal for the Typhoon.

“We are very engaged,” he says. “We want to propose the Typhoon, the most advanced new generation multi, swing-role fighter on the market today."

In October, RCAF issued a draft request for proposal to replace its aging CF-18A/B fleet. Ottawa listed five suppliers eligible to compete: Dassault Aviation, maker of the Rafale; Saab, maker of the JAS 39 Gripen; Airbus Defense – on behalf of the Eurofighter joint venture, maker of the Typhoon; Lockheed Martin, maker of the F-16 and F-35; and Boeing, maker of the F/A-18 Super Hornet and F-15E Strike Eagle. Only those five will be allowed to submit proposals.

The RCAF plans to receive initial proposals from bidders between summer and winter 2019. A contract is anticipated to be awarded during the winter months of 2021-2022.

Canada wants initial aircraft to be delivered in 2025, with initial operational capability achieved by 2026. The government wants all aircraft delivered by 2031 or 2032, at which time the CF-18 fleet will be retired.

Jacques says the Eurofighter bid will include some sort of participation from Canadian manufacturers, though the type of involvement in the aircraft’s supply chain or extent was not specified.

"With our Canadian partners, it is going to be a Canadian solution and a good value for Canada," he says. "The RFP is coming out in mid of this year, right before the election."

https://www.flightglobal.com/news/artic ... 18-455004/
 
RJMAZ
Posts: 3573
Joined: Sat Jul 09, 2016 2:54 am

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 3:09 am

I think the decision comes down to the willingness of Canada to be part of the tip of the spear in a major conflict. Canada has never provided high end fighters in any conflict. The F-35 is the obvious selection if they now want to do so.

However there is nothing wrong with Canada accepting their traditional policing role and providing the role of escorting tankers/awacs etc, in lower risk areas. These jobs still need to be filled in a major conflict and it frees up higher end assets to be used in higher risk areas.

I think the Gripen has a very good chance. It has the lowest operating costs by a very significant margin. The Hornets have only ever done basic missions and the Gripen will be able to do similar missions for the next couple decades. Single engine over the arctic is only a minor issue which the F-35 also shares.
 
krisyyz
Posts: 1444
Joined: Thu Nov 25, 2004 11:04 pm

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 4:09 am

I still don’t see how a single engine fighter would work for us. If northern sovereignty is a priority, and given the size of our airspace, we need something that has a fighting chance of making an airfield on a single working engine. The Super Hornet is still my pick, it’s relatively cheap, available quicker, proven and has some level of commonality with the Hornet.

If we get a new government in October, or a minority, I can totally see this project be altered or restarted, once again.

Krisyyz
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 4:57 am

RJMAZ wrote:
I think the decision comes down to the willingness of Canada to be part of the tip of the spear in a major conflict. Canada has never provided high end fighters in any conflict. The F-35 is the obvious selection if they now want to do so.

However there is nothing wrong with Canada accepting their traditional policing role and providing the role of escorting tankers/awacs etc, in lower risk areas. These jobs still need to be filled in a major conflict and it frees up higher end assets to be used in higher risk areas.


The RCAF Hornets contributed significantly during the Balkans conflict, especially in 1999 where they conducted a significant number of A2G strikes. They sat out of the second Gulf War to the detriment of their US relationship for a number of years (in hindsight probably a wise decision…). They dropped a credible number of weapons over Libya and also conducted A2G strikes against ISIS until Trudeau withdrew them. In all of those conflicts the CF-18 was as capable as or more so than comparable aircraft from partner nations.

RJMAZ wrote:
I think the Gripen has a very good chance. It has the lowest operating costs by a very significant margin. The Hornets have only ever done basic missions and the Gripen will be able to do similar missions for the next couple decades. Single engine over the arctic is only a minor issue which the F-35 also shares.

I don’t think so. The intelligence sharing issues that forced Dassault to withdraw present for a start. Secondly the Gripen, even in E form, has the shortest range (with a meaningful payload) of any of the options as well as the least capable set of systems and sensors. It will also likely be unable to lower the cost per aircraft to F-35A levels given the respective production volumes but it may be the cheapest to sustain, at least for a time. I would expect the Gripen to require at least two upgrades over its life of type and more likely three to maintain capability which is the hidden cost of future fighter sustainment.

krisyyz wrote:
I still don’t see how a single engine fighter would work for us. If northern sovereignty is a priority, and given the size of our airspace, we need something that has a fighting chance of making an airfield on a single working engine. The Super Hornet is still my pick, it’s relatively cheap, available quicker, proven and has some level of commonality with the Hornet.

Krisyyz

While the Super Hornet seems an attractive choice it goes out of service with the USN in 2040. With only two other operators of the jet, the RAAF who will almost certainly retire the aircraft by 2035 before the USN, and Kuwait, hardly a first tier air force, acquiring the Super Hornet to operate for 30+ years in 2025 is a significant risk. The platform is likely to be unsustainable or simply prohibitively expensive to maintain once it leaves USN service.

The single engine/duel engine argument has been discussed here at length but there is nothing to support the argument, with the current generation of engines, that a single engine aircraft is any less reliable. Many nations operate single engine aircraft in similar conditions to Canada and have excellent safety records.

krisyyz wrote:
If we get a new government in October, or a minority, I can totally see this project be altered or restarted, once again.

To what end? There aren’t any other manufacturers that could realistically offer an alternative and the RCAF have been pretty clear on requirements. The only reason I could see for a delay would be for budgetary reasons but that just pushes the acquisition cost out further and increases the Hornet sustainment cost significantly. In fact pushing the contest out further would likely see both the Eurofighter and Super Hornet end production while there would be a significant gap until FCAS, Tempest or PCA (if they can even afford it) are available.
 
User avatar
seahawk
Posts: 10434
Joined: Fri May 27, 2005 1:29 am

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 6:43 am

Imho the only sensible options are Eurofighter and F-35. And EF only if you want 2 engines.
 
User avatar
keesje
Posts: 15156
Joined: Thu Apr 12, 2001 2:08 am

Re: Canada - Future Fighter Capability Project

Tue Jan 15, 2019 12:06 pm

seahawk wrote:
Imho the only sensible options are Eurofighter and F-35. And EF only if you want 2 engines.


I see the EF origin as a traditional cold war interceptor, with the performance, range and equipment for that. Over the years it got adjusted for air to ground. But endurance, long missions and air to ground (stealth) are add on's after the Germans threatened to walk out. You can put on new radar, hang many bombs & missles and many fuel tanks on it, saying it fits the bill.

It is proven, being in operation for 25 years, first prototypes flew 35 years ago... but ordering non stealth for the next 30 years as sole solution ? ...

Image

I still feel the french are sitting on the fence & we haven't heard the last from them. Because every alternative seems to have it's disadvantages. A stake in the French / German program could be tempting. The situation is changing e.g. the french are investing billions in Rafale

https://www.usnews.com/news/world/articles/2019-01-14/dassault-wins-french-contract-to-upgrade-the-rafale-fighter

French are aligning exports with the Germans, while Spain is trying secure a place on the table. The Brits are scratching their heads amid this crazy Brexit that industry / military never wanted in the first place.. Maybe there is an opportunity here for the Canadians combining a interim platform with a sixt gen solution.
 
426Shadow
Posts: 252
Joined: Tue Sep 11, 2007 8:13 am

Re: Canada - Future Fighter Capability Project

Wed Jan 16, 2019 1:53 am

If they don't pick the F-35 (which I don't necessarily think they should) then they need to be kicked out of the F-35 Industrial Share team (or whatever its called). If they want part of the pot, then they need to play some chips.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Jan 16, 2019 3:57 am

426Shadow wrote:
If they don't pick the F-35 (which I don't necessarily think they should) then they need to be kicked out of the F-35 Industrial Share team (or whatever its called). If they want part of the pot, then they need to play some chips.

That is a given. Further industrial participation is directly tied to ordering and operating the jet. Should Canada chose a different aircraft for all 88 new jets then Canadian Industry would lose the opportunity to bid on all new contracts and likely have existing contracts wound down as replacement vendors were identified, of which there are many willing participants.

Canada has continued to pay their JSF Industrial program payments all through the Trudeau Government highlighting the disparity between the spoken political word and action occurring behind the scenes.

The interesting position is if the government tries to satisfy both camps by acquiring two separate aircraft. Ordering a small quantity of F-35s, perhaps 24 to operate for NATO operations, while ordering a second airframe for NORAD duties, is possible but highly unlikely, as I don’t believe the tender has been structured to allow that. A dual aircraft fleet isn’t the cheapest option and as the study I have posted here multiple times from the Canadian Department of Defence, http://army.ca/forums/index.php?action= ... tach=53025 shows two airframes to support the separate NORAD and NATO missions can provide the same capability but only with significant more aircraft and pilots than a single type fleet.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Feb 06, 2019 9:06 pm

I love how ironic this is for the Canadian Government. Flop back and forth and end up having to pay more to support a program the Liberal Government campaigned they would leave. Then run an open competition with signs pointing to the F-35 being selected in 2021, especially if the unit flyaway cost continues to drop as expected below US$80 million by then.

Canada forced to pay bigger share of F-35 fighter jet development costs — even though it may never buy any

Canada is being forced to shoulder a bigger share of the costs of developing F-35 fighter jets even though it has not decided whether it will buy any.

Canada is one of nine partner countries in the F-35 project, each of which is required to cover a portion of the stealth fighter’s multibillion-dollar development costs to stay at the table.

Each country pays based on the number of F-35s it’s expecting to buy. Canada has pitched in more than half-a-billion dollars over the last 20 years, including $54 million last year.

But that amount was based on the Stephen Harper government’s plan to buy 65 new fighter jets to replace Canada’s aging CF-18s, which the Trudeau government has since officially increased to 88.

Even though Canada has not committed that those 88 jets will be F-35s, the Department of National Defence says that change means it will have to pay more to remain a partner — including about $72 million this year.

“Canada’s costs under the F-35 (partnership agreement) are based on an intended fleet size,” Defence Department spokeswoman Ashley Lemire said in an email.

“Canada changed its fleet size within the F-35 (agreement) from 65 to 88 aircraft to align with government decisions on the size of the intended permanent fighter fleet to be acquired through competition and the payment increased accordingly.”

As each partner contribution is determined annually, based on the overall cost of the F-35 development program for that specific year, Lemire said she could not provide details how much more Canada will have to pay.

The F-35’s development costs have been a constant source of criticism over the life of the stealth-fighter program, which Canada first joined under the Chretien government in 1997. The entire program is believed to have already cost more than US$1 trillion.

The Trudeau government says it plans to keep Canada in the F-35 development effort until a replacement for the CF-18s is chosen — partners in the development work can buy the planes at a lower price and compete for work associated with their production and long-term maintenance.

Canadian companies have so far won more than $1.2 billion in contracts related to the F-35, according to the government.

The F-35 is one of four planes slated to participate in the $19-billion competition that the government plans to launch this spring, the others being Boeing’s Super Hornet, Eurofighter’s Typhoon and Saab’s Gripen.

The competition isn’t scheduled to select a winner until 2021 or 2022, meaning Canada will be on the hook for several more payments. The first new aircraft is expected in 2025 and the last in 2031, when the CF-18s will be phased out.

F-35 maker Lockheed Martin says more than 350 of the stealth fighters have been delivered to different countries, while Israel became the first country to use the plane in combat last year when two of the jets struck targets in neighbouring Syria.

Acting U.S. defence secretary Patrick Shanahan, a former Boeing executive, nonetheless criticized the program on Monday, saying it “has room for a lot more performance.”

“I am biased toward performance,” he was quoted as saying when asked if he is biased toward Boeing. “I am biased toward giving the taxpayer their money’s worth. And the F-35, unequivocally, I can say, has a lot of opportunity for more performance.”

https://leaderpost.com/news/local-news/ ... c1da9f5c99
 
User avatar
Nomadd
Posts: 722
Joined: Sat Dec 09, 2017 3:26 pm

Re: Canada - Future Fighter Capability Project

Wed Feb 06, 2019 9:25 pm

Ozair wrote:
I love how ironic this is for the Canadian Government. Flop back and forth and end up having to pay more to support a program the Liberal Government campaigned they would leave. Then run an open competition with signs pointing to the F-35 being selected in 2021, especially if the unit flyaway cost continues to drop as expected below US$80 million by then.

Canada forced to pay bigger share of F-35 fighter jet development costs — even though it may never buy any

Canada is being forced to shoulder a bigger share of the costs of developing F-35 fighter jets even though it has not decided whether it will buy any.

Canada is one of nine partner countries in the F-35 project, each of which is required to cover a portion of the stealth fighter’s multibillion-dollar development costs to stay at the table.

Each country pays based on the number of F-35s it’s expecting to buy. Canada has pitched in more than half-a-billion dollars over the last 20 years, including $54 million last year.

But that amount was based on the Stephen Harper government’s plan to buy 65 new fighter jets to replace Canada’s aging CF-18s, which the Trudeau government has since officially increased to 88.

Even though Canada has not committed that those 88 jets will be F-35s, the Department of National Defence says that change means it will have to pay more to remain a partner — including about $72 million this year.

“Canada’s costs under the F-35 (partnership agreement) are based on an intended fleet size,” Defence Department spokeswoman Ashley Lemire said in an email.

“Canada changed its fleet size within the F-35 (agreement) from 65 to 88 aircraft to align with government decisions on the size of the intended permanent fighter fleet to be acquired through competition and the payment increased accordingly.”

As each partner contribution is determined annually, based on the overall cost of the F-35 development program for that specific year, Lemire said she could not provide details how much more Canada will have to pay.

The F-35’s development costs have been a constant source of criticism over the life of the stealth-fighter program, which Canada first joined under the Chretien government in 1997. The entire program is believed to have already cost more than US$1 trillion.

The Trudeau government says it plans to keep Canada in the F-35 development effort until a replacement for the CF-18s is chosen — partners in the development work can buy the planes at a lower price and compete for work associated with their production and long-term maintenance.

Canadian companies have so far won more than $1.2 billion in contracts related to the F-35, according to the government.

The F-35 is one of four planes slated to participate in the $19-billion competition that the government plans to launch this spring, the others being Boeing’s Super Hornet, Eurofighter’s Typhoon and Saab’s Gripen.

The competition isn’t scheduled to select a winner until 2021 or 2022, meaning Canada will be on the hook for several more payments. The first new aircraft is expected in 2025 and the last in 2031, when the CF-18s will be phased out.

F-35 maker Lockheed Martin says more than 350 of the stealth fighters have been delivered to different countries, while Israel became the first country to use the plane in combat last year when two of the jets struck targets in neighbouring Syria.

Acting U.S. defence secretary Patrick Shanahan, a former Boeing executive, nonetheless criticized the program on Monday, saying it “has room for a lot more performance.”

“I am biased toward performance,” he was quoted as saying when asked if he is biased toward Boeing. “I am biased toward giving the taxpayer their money’s worth. And the F-35, unequivocally, I can say, has a lot of opportunity for more performance.”

https://leaderpost.com/news/local-news/ ... c1da9f5c99

"The entire program is believed to have already cost more than US$1 trillion"
Uh.....yeah
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Wed Feb 06, 2019 10:06 pm

Nomadd wrote:
"The entire program is believed to have already cost more than US$1 trillion"
Uh.....yeah

Ha, I didn’t even catch that. Very poor journalism at best and blatantly wrong as well. The whole development program and acquisition of 2456 aircraft by the US is approx. $400 billion as per the last SAR. It is only when you include the life cycle costs for operations of those 2456 to 2073, and a host of currency fluctuation, that you get those stupid trillion dollar figures.

As for how much money they have spent to date, it is probably in the US$130 billion region worst case scenario.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Tue Apr 16, 2019 12:51 am

Somewhat of a sales pitch for the Gripen given the line that Russian capabilities such as the S-400 are not as vaunted as they appear to be and therefore non stealth fighters are good enough… Of course when you plan to operate the aircraft for the next 35 years that logic doesn’t exactly hold much water.

Canada's fighter jet tender competition (finally) takes off next month

The politically charged competition to replace Canada's aging fleet of fighter jets will rocket forward at the end of May as the federal government releases a long-anticipated, full-fledged tender call.

There are four companies in the running: Saab of Sweden, Airbus Defence and Space out of Britain, and the American firms Boeing and Lockheed Martin.

Once the request for proposals is released, the manufacturers will have until the end of the year to submit bids, defence and industry sources told CBC News.

It was the former Conservative government that kicked off the effort to replace the three-decade-old CF-18s in 2010, an attempt that was shot down in a dispute over the way the F-35 fighter was selected.

The program became mired in politics when the Liberals promised during the 2015 election campaign not to buy the stealth jet. A final decision will now have to wait until after this fall's election.

...

https://www.cbc.ca/news/politics/fighte ... -1.5096811

more at the link.
 
Ozair
Posts: 5584
Joined: Mon Jan 31, 2005 8:38 am

Re: Canada - Future Fighter Capability Project

Mon May 06, 2019 11:40 pm

Offsets were always going to be an issue. It will be interesting to see how this plays out in the competition going forward. It is a strange irony that the F-35 program will provide Canada more industrial work over the next 50 years than any of the competitors but is the one that cannot commit to the offset clause, and legally doesn’t have to.

My expectation is the F-35 will get a waiver or the value of offsets within the ranking will be lowered to an insignificant number so it doesn’t impact the selection. I am in no way an expert on Canadian Government procurement though so keen for other more knowledgeable people to clarify the position or other possible options.

Ottawa's planned fighter competition incompatible with F-35 obligations: U.S.

U.S. officials have warned the Trudeau government that its plan to hold an open competition to replace its aging CF-18s is incompatible with Canada’s obligations as a member of the F-35 stealth-fighter program.

The warnings are in two letters sent to the government last year that were obtained by defence analyst Richard Shimooka and released in a report published by the Macdonald-Laurier Institute think-tank.

The letters specifically take issue with the government’s plan to have each fighter-jet maker commit to re-investing in Canada if its aircraft wins the upcoming competition aimed at buying 88 new planes for $19 billion.

While that is standard for most Canadian military procurements, the U.S. officials note that Canada agreed not to apply such a requirement when it signed on as one of nine F-35 partner countries in 2006.

Companies in those countries are instead allowed to compete for work associated with the plane, and the U.S. officials say imposing requirements as a condition to bid will mean the F-35 won’t be entered in the race.

Canada has contributed roughly $500 million over the past 20 years toward developing the F-35, which now is expected to compete against three other aircraft to replace the CF-18s.

https://www.citynews1130.com/2019/05/06 ... tions-u-s/

A lot more detail is available here, http://macdonaldlaurier.ca/files/pdf/20 ... a_FWeb.pdf which is a pretty frank write up about the issues faced and includes in Annex B the letter from the US to the Canadian Government questioning the application of offsets and membership in the F-35 program.
 
ThePointblank
Posts: 4426
Joined: Sat Jan 17, 2009 11:39 pm

Re: Canada - Future Fighter Capability Project

Sun May 12, 2019 1:56 am

A bit of a monkey wrench in the works; American officials will need to sign off and certify the fighter jet Canada buys to ensure the fighter jet meets American intelligence sharing requirements:

https://www.theglobeandmail.com/canada/ ... ion-dnd-2/

American officials will need to certify the fighter jet Canada buys at the end of a multibillion-dollar procurement that’s started and stopped and started again for more than a decade, ensuring that it’s fit to plug into the U.S.’s highest-security intelligence systems.

But, says the Department of National Defence’s top procurement official, they will not get to decide which plane replaces Canadian military’s aging CF-18s.

“Ultimately when we select, when we are into the detailed design, at some point, yes, the U.S. will have a role to play in ultimate certification,” Patrick Finn, the Defence Department’s assistant deputy minister of materiel, told The Canadian Press.

“But the Americans won’t be sitting with us with the evaluation and doing that type of work. It will be us.”

Some industry sources are nonetheless worried the U.S. could use the certification requirement to block Canada from choosing a non-American plane, particularly given the Trump administration’s approach to trade.

The federal government this week laid out the latest iteration of its plan for the $19-billion competition to replace Canada’s CF-18s with 88 new fighters, which is expected to officially launch in July.

While much of the presentation delivered to fighter-jet makers focused on a loosening of industrial-benefit rules (that is, how much the winning bidder will be expected to spend on work and production in Canada), the government also revealed that companies will be asked to show how they plan to meet certain security requirements.

Specifically, companies will have until September to explain how they plan to ensure their aircraft can comply with the standards required for handling top-secret intelligence from two security networks in which Canada takes part, called “Five Eyes” and “Two Eyes.”

The “Five Eyes” network comprises Canada, the U.S., the United Kingdom, Australia and New Zealand. “Two Eyes” is just Canada and the U.S. and is essential for co-operating in the defence of North America.

Meeting those requirements will pose different challenges for the four plane models that are expected to square off to replace the CF-18s, with the U.S.-made Lockheed Martin F-35 and Boeing Super Hornet already fully compliant.

The other two expected competitors, the Eurofighter Typhoon and Saab Gripen, will face a tougher time. The Typhoon, which is used by the British military, already meets Five-Eyes requirements, but neither it nor the Swedish-made Gripen meets the Two-Eyes standard.
 
ExMilitaryEng
Posts: 759
Joined: Mon May 01, 2017 7:12 pm

Re: Canada - Future Fighter Capability Project

Mon May 13, 2019 4:19 pm

ThePointblank wrote:
A bit of a monkey wrench in the works; American officials will need to sign off and certify the fighter jet Canada buys to ensure the fighter jet meets American intelligence sharing requirements: https://www.theglobeandmail.com/canada/ ... ion-dnd-2/


Interesting aspect indeed.

While I'm strongly convinced with the US military professionalism in this eventual assessment, I'm not so sure with the political side... So let's say for some reasons non-US aircrafts get disqualified; it could just delay big time the acquisition process (assuming a non-US aircraft was the front runner).

In the mean time, the Canadian "Air" contribution to NORAD/NATO would just get weaker and weaker...
  • 1
  • 2
  • 3
  • 4
  • 5
  • 10

Who is online

Users browsing this forum: No registered users and 37 guests

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos